Asiacell Project
The work including demolishing walls, reinforcement concretes & floors either concrete or tile
About project
Demolishing works
The work including demolishing walls, reinforcement concretes & floors either concrete or tile including (porcelain in floor, ceramic in wall & floor w.c, gypsum plaster and removing all debris away from the site according to site engineer instructions.
Aluminum partitions: using best aluminum sections, thickness of panel no less than 1.6mm, including all accessories, as detailed in the drawings. The work includes providing and fixing of door stoppers, switch locks, handles, hydraulic door closer and all accessories should be first class., type of locks should be of special type to be selected by Site Engineer,
Apply wall paper for 1st floor walls with all requirements Providing PVC doors for 1st sanitary cabins
Prepare DG foundations, with estimated dimensions (60*40) cm, using concrete c30, the work contain preparing works, supplying steel bars, preparation the location for cast according to layout will be provide by extra consultant, the work contain also preparations, curing, removing all materials of work outside the building
Providing & installing I beams for generators & fuel tank Providing & installing fuel pipes to fuel tank in top of building
supply and installing generator & fuel tank canopy including 3*3 inch main columns & 3*1.5 inch for the supports 0.7mm curb plates for covering with all work cost,
Providing and installing Led light 3 Inch
Supply & install a PVC partitions for temporary shop
Supply & install roof tiles 60*60 for temporary shop
Covering the way to W.C in 1st floor, by PVC partition + wall covering
Provide and install Porcelain tiles with dimensions (120x 60 cm) with cement sand mortar (1:3) and all necessary work according to site engineer instructions.
Providing materials and laying ceramic Tiles for the wall with cement sand mortar (the cost includes providing all necessary materials) according to site engineer instructions.
Supply materials to cover walls using straight gypsum board panel with plaster, paint with best quality according to the design & instruction of site Engineer with all necessary works, accessories and finishing
Supply materials to cover column using round gypsum board with plaster, paint with best quality according to the design & instruction of site Engineer with all necessary works, accessories and finishing
Supply materials to cover ceiling using gypsum board with plaster, paint with best quality according to the design & instruction of site Engineer with all necessary works, accessories and finishing
Supply & install material, skirting for straight & round gypsum board with ceramic tile cement sand mortar (1:3)
Supply & install air conditioning celling split unit system with all required working & materials including cabling, switch plugs, piping, base stand for the outdoor unit according to site engineer instructions.
– Cassette type indoor unit
– Operation: Auto restart function – Heat pump compressor (T3)
– Capacity: 3TR
Alcobond Works: Design, Supply material, dressing & fixing sheets Best Type 6mm thickness, according to the design & Site Engineer direction and dismantle old layers
Provide & fixed Tempered glass 10 mm for façade and dismantle old layers and according to design and site Engineer Instructions
Provide & fixed door Tempered glass 10 mm. The work includes providing and fixing of door stoppers, switch locks, handles, hydraulic door closer and all accessories should be first class doors for façade and dismantle old doors according to design and site Engineer instructions
Provide & install white wood door first class with all accessories the cost includes taking out the old door and fixing this new one in its place properly
Provide & install heavy steel door first class with all accessories and fixing this new one in its place properly
Supply & install of Interior Lighting LED strips in walls hidden connection with all necessary works and accessories also cover all cables with PVC
Supply & install of Interior Lighting Fixture (Spot Light 12w) BG or best type, ceiling mounting, cover all cables with PVC
Provide and install circular lights diameter (1-1.5m) with engraved letters on it according to Asiacell requirements and to cover all cables with PVC
Supply & Install (switches, socket outlet,) by using specials cables for lighting and power systems installed inside best type heavy duty PVC conduits or galvanized cable trays with all accessories), (wires work included beside required switches).
Provide & install electric board (60x30x20cm) for with circuit breaker (40A,30A,16A…) using rubber gaskets, the work also includes the required, glands, screws, insulators … etc. all items should be arranged properly, affords a high degree of safety operation and as per Asiacell site engineer’s instructions.
Toilet set western type: Supply materials and install complete (WC) set western type, consist of ceramic pan (Grohe or best quality), flushing tank (best quality) with all connections, valves (chromium), hoses (steel covered), Stainless Steel Sprayer Shatter Set, Hand Held drain pipe with all necessary requirements, the toilet to be supplied with tissue holder (Best quality) and supporting handle tool. Dismantle old basin according to design & site engineer instructions.
Provide & install wash basin with all accessories (mixers, mirror, cabinet, pipes…) dismantle old basin according to design & site engineer instructions.
Provide and install shutter electrical gate best type with all accessories (door panels, motor, box, power material…) & testing.
Provide & install MDF cupboard (60×160 cm) according to design.
Provide & install mobile advertisement integral, Red Powder Painted Metal Frame on LED.
Provide & install Screen panel 60 inch with all accessories.
Provide & install Asiacell logo (3 m) in facade shop with all accessories.
Express desk First Class Veneered MDF, Beech Wood Finish, First Class Desk Veneered MDF top, Finish with Stainless Steel Chrome Stand for manager and employee’s desk and First Class Desk Veneered MDF top, Finish with Stainless Steel Chrome Stand for manager and employee’s desk and all other furniture,